Case study ยท Critical infrastructure
Industrial OT connectivity at a remote UK processing facility was transitioned with controlled testing, and the agreed application tests were closed.
The client had to move industrial OT connectivity at a remote UK processing facility without losing the operational integration the site depends on.
Understand the connectivity, the boundaries and the applications that depended on them.
Set the cutover plan and the test set that had to pass.
Coordinate the operational cutover and the controlled testing.
Put the agreed connectivity in place for the new operating state.
The agreed tests were closed, and the operational integration was kept through the cutover.